Balikpapan · Indonesia

Hi, I'm Jein.

Jein Ananda
@jeinanandaAvailable for work!
Scroll down

01 / ABOUT

I work across infrastructure, development, and design to turn complex technical needs into useful digital products.

Laravel✦Vue.js✦Nuxt✦React✦Python✦MySQL✦PostgreSQL✦Firebase✦Figma✦Docker✦Git✦Networking✦
Laravel✦Vue.js✦Nuxt✦React✦Python✦MySQL✦PostgreSQL✦Firebase✦Figma✦Docker✦Git✦Networking✦

ACADEMIC PATH

EDUCATION

The foundation of knowledge and skills that shaped my journey in technology.

01 / 02

Kalimantan Institute of Technology

Bachelor of Computer Science in Information System

GPA 3.59 / 4.00 · Thesis: UI/UX Design of Employee Information System Application

2022 — 2026
02 / 02

SMKN 6 Balikpapan

Computer and Network Engineering

MikroTik networking, routing, VPN, firewall configuration, and network assembly

2019 — 2022

BEYOND THE DAY JOB

AWARDS & ORGANIZATION

Scholarships and student-organisation work that ran alongside study and work.

EXPERIENCES

CAREER ARCHIVE

EXPERIENCES

A chronological look at my growth in the tech industry.

PROFESSIONAL EXPERIENCE FULL-TIME

Technology Infrastructure Engineer

Maybank

APR 2026 — PRESENT

Resolving 125+ IT service requests per month across 3 branch offices, from core banking applications and LAN connectivity to server room and hardware support.

01IT service desk (ITSM)
02Core banking application support
03Server room monitoring
04LAN recabling projects
VIEW FULL ROLE
Maybank01
PROFESSIONAL EXPERIENCE INTERNSHIP

Web Developer Intern

PT Komatsu Remanufacturing Asia

JUN 2025 — FEB 2026

Developed the web version of the Employee Information System so employees without mobile access could use the same core workflows.

01Responsive EIS interfaces
02Attendance & reimbursement flows
03Approval workflows
04Laravel application development
VIEW FULL ROLE
PT Komatsu Remanufacturing Asia02
PROFESSIONAL EXPERIENCE INTERNSHIP

UI/UX Design Intern

PT Komatsu Remanufacturing Asia

JAN 2025 — MAY 2025

Designed mobile and web interfaces for an Employee Information System used by more than 700 employees, validated through usability testing.

01Design Sprint workshops
02Face-recognition attendance flow
03Usability testing
04High-fidelity Figma prototypes
VIEW FULL ROLE
PT Komatsu Remanufacturing Asia03
PROFESSIONAL EXPERIENCE PART-TIME

Assistant Lecturer

Kalimantan Institute of Technology

JAN 2024 — DEC 2025

Taught networking, operating systems, and cloud computing practicums, and mentored 50–60 students per class across 7 courses.

01Computer Network Design & Management
02Operating Systems (Ubuntu/Linux)
03Cloud Computing & Docker
04Cisco Packet Tracer
VIEW FULL ROLE
Kalimantan Institute of Technology04
DRAG TO EXPLORE SWIPE 01 / 04

PORTFOLIO SHOWCASE

SELECTED PROJECTS

AWS Idle Resource Checker
01 / 084 SCREENS

CLOUD INFRASTRUCTURE

AWS Idle Resource Checker

A Python tool that scans EC2 instances, reads CPU utilisation from CloudWatch, flags idle servers, and estimates what keeping them running costs per month. Built and tested in a locked-down AWS Free Plan lab.

HIGHLIGHTS

  • 01Set up an AWS Free Plan account with MFA on the root user, a separate IAM user for daily work, and an AWS Budgets alert as a cost safety net
  • 02Launched three EC2 test instances in Singapore — two left idle and one running continuous CPU load — all with no public IP, no SSH, and no key pairs
  • 03Connected from the laptop through the AWS CLI, keeping access keys in the local AWS config so no credentials appear in code or in the repository
Pythonboto3EC2CloudWatchIAMAWS CLI
VIEW PROJECT ->
NEXT PROJECT / 02 / 08
EIS Mobile UI/UX Design
02 / 084 SCREENS

UI/UX DESIGN

EIS Mobile UI/UX Design

A mobile Employee Information System experience covering attendance, reimbursement, and time management for 700+ employees.

HIGHLIGHTS

  • 01Conducted stakeholder interviews and user research with employees across multiple departments
  • 02Facilitated Design Sprint workshops to align business goals with user needs
  • 03Created user flows and information architecture for complex HR workflows
FigmaUI/UXMobile Design
VIEW PROJECT ->
NEXT PROJECT / 03 / 08
MiniZoo Balikpapan — Wildlife Park Website
03 / 085 SCREENS

UI/UX DESIGN

MiniZoo Balikpapan — Wildlife Park Website

A six-page website concept for a mini zoo in Balikpapan, designed during KKN: ticketing, animal profiles, flora & fauna catalogue, news, and documentary.

HIGHLIGHTS

  • 01Mapped a six-page structure: home, ticket catalogue, flora & fauna, animal profiles, news, and documentary.
  • 02Designed the home journey from the hero carousel down to the ticket list, opening-hours panel, statistics band, and activity posts.
  • 03Built one card system for tickets, animals, activities, and documentaries so new content drops into an existing layout.
FigmaUI/UXWeb DesignInformation Architecture
VIEW PROJECT ->

GET IN TOUCH

BALIKPAPAN, ID / 13:19 WITA


Have a project in mind? Tell me a little about it and I’ll get back to you.

© 2026 JEIN ANANDA · ALL RIGHTS RESERVED.